TH400 rebuild tech

Jump to: navigation, search
(Main case bushing replacement)
(Center support assembly)
Line 85: Line 85:
 
It helps to heat the rings in hot water before installing so that they will stretch easier. A piece of plastic (from a paint can cap) that is cut to size can be used to install and size the rings. Leave it on until you are ready to install the direct drum.
 
It helps to heat the rings in hot water before installing so that they will stretch easier. A piece of plastic (from a paint can cap) that is cut to size can be used to install and size the rings. Leave it on until you are ready to install the direct drum.
  
{{Note1}} One sealing ring has been left off, 2nd from top groove. This groove separates the direct (3rd gear) and reverse feeds from each other. When dual feeding the directs (as done in this build), this sealing ring is not necessary. Dual feeding the directs on a TH400 will be covered in more depth in another section.
+
One sealing ring has been left off, 2nd from top groove. This groove separates the direct (3rd gear) and reverse feeds from each other. When dual feeding the directs (as done in this build), this sealing ring is not necessary. Dual feeding the directs on a TH400 will be covered in more depth in another section.
  
 
[[File:Center_support_rings.jpg]]
 
[[File:Center_support_rings.jpg]]

Revision as of 00:29, 25 March 2023

Personal tools
Namespaces
Variants
Actions
Navigation
Categories
Toolbox